§ 155.045 LOTS.
   (A)   The lot arrangement shall be such that there will be no foreseeable difficulties in securing building permits to build on all lots in compliance with Chapter 157 and Health Department regulations.
   (B)   Lot dimensions, areas, and building setback lines shall conform to the requirements of Chapter 157.
   (C)   The lot shape, size, and orientation shall be appropriate for the location of the subdivision and for the type of development and use contemplated.
   (D)   All lots shall have 20 feet of frontage on a public road which is presently, or shall be upon completion of the subdivision, publically maintained, unless otherwise specified in Chapter 157. The road/street system of the subdivision shall access directly upon a dedicated road publicly maintained, or road/street which upon completion of the subdivision shall be publicly maintained. Lots with access only to existing private streets or easements shall be permitted only in circumstances in which an extraordinary hardship exists and with the approval of a waiver by the County Board.
   (E)   If any portion of a lot falls within the boundaries of critical soils as identified by the County Soil and Water Conservation District for on-site wastewater disposal systems, that portion of such lot shall be designated as restricted for use of septic systems unless evidence can be produced that the soils can be managed by appropriate common engineering practices which would render the soils suitable. Soils removal and replacement are not considered a suitable management practice.
(Res. LU-20-10, passed 11-18-2020)