Review of Access Management and Traffic Impact Studies shall include consideration of:
(a) The potential for existing or future access drives (front or rear)
(b) The need for reciprocal easement agreements (on-site only)
(c) Adequacy of proposed driveway geometry serving proposed development
(d) Limitation on the number of driveways
(e) Necessary turn lane improvements
(f) Limited left/right turn direction driveways
(g) Restricted left/right turn
(h) Reduction/elimination/shared driveways
(i) Road/drive alignment (including alignments with drives and roads on opposite sides of the street or road.
(j) Traffic control devices associated with site access
(k) Right turn deceleration lanes