(A) Prior to construction of new water mains, all plans and materials must be approved by the Village Administrator, in addition to obtain other approvals required by law. All constructions will be in accordance with accepted engineering practice and American Water Works Association Standards and Ohio Environmental Protection Agency Design Standards relating to both construction methods and material. In addition, no backfill will be placed on any new construction until after inspection is completed by the Village Administrator or his or her duly authorized representative. The owner shall pay any costs resulting from said inspection.
(B) Upon completion of construction of any water mains, drawing shall be corrected to represent "as built" elevations, grades and sizes. One reproducible print shall be supplied to the village.
(C) In addition to the requirements enumerated in divisions (A) and (B) above, a bacteriological testing charge shall be made for each new, cleaned or repaired water main in the village. The charge shall be $100 for all testing necessary to meet Ohio Environmental Protection Agency disinfection requirements. This fee will be increased to $200 if the testing is not performed during normal working hours. Normal working hours shall be considered 7:00 a.m. through 3:30 p.m., Monday through Friday with the exception of village holidays.
(Ord. 80-26, passed 11-10-1980; Ord. 92-20, passed 9-28-1992; Ord. 2003-50, passed 12-8-2003; Ord. 2019-17, passed 5-13-2019)