§ 52.06 NEW CONNECTION.
   For any new connection to the village water system inside the corporation limits of the village, a tap-in charge of $1,000 will be assessed. For any approved new connection, as provided in § 52.08, to the village water system outside the corporation limits of the village, a tap-in charge of $2,500 will be assessed. The village will, after payment of this fee, install the tap, the curb box and service line between the two, provided, however, if a service line greater than one inch in diameter is required, all excess costs will be paid by the owner.
(Ord. 80-26, passed 11-10-1980; Ord. 92-20, passed 9-28-1992; Ord. 97-27, passed 10-27-1997; Ord. 97-34, passed 12-8-1997; Ord. 2004-31, passed 10-11-2004; Ord. 2019-17, passed 5-13-2019)