§ 92.05 DUTIES UPON COMPLETION OF WORK.
   After the trenching, excavation or opening shall have been made, the Permittee shall backfill the excavation with such materials and in such manner as the city may require, and leave the street, highway, right-of-way, or easement in at least the same or better condition than it was before the opening was made.
(Ord. 880202, passed 2-2-1988; Ord. 891219, passed 12-19-1989) Penalty, see § 92.99