(A) (1) A service connection permittee shall notify the Inspector when the building sewer and service connection are ready for inspection.
(2) The excavation shall be left open until inspection is complete.
(3) If the Inspector determines that the building sewer and service connection have been constructed and installed in accordance with the requirements of this chapter, the building sewer shall then be connected with the service connection under the observation of the Inspector.
(4) The inspection shall include the installation of all required components of the service connection, including without limitation, wiring, conduit, sealants, riser, discharge lines, and related necessary appurtenances.
(B) Connection by major users shall also be inspected by the City of Jackson.
(Ord. 12.00, passed 9-14-1999)