1108.18 SURVEY MONUMENTS.
   (a)    All survey monumentation shall conform to requirements set forth in O.A.C. Chapter 4733-37.
   (b)    The Developer's surveyor shall find or set iron pins at all corners of all parcels created by the subdivision.
   (c)    The centerline of right-of-way of all roads within a subdivision shall be physically defined by survey monumentation set at all centerline locations including Point of Curvature, Point of Tangent, cul-de-sac, stub street terminations and road intersections. The Developer's Surveyor shall set a minimum of ¾ inch solid iron pins or rebar in monument box assemblies at the above centerline locations. Monument box assemblies shall be approved by the County Engineer. The County Engineer may require other monuments or iron pins to be set in the subdivision. Other types of markers may be used if approved by the County Engineer.
   (d)    All iron pins set by the Developer's Surveyor shall be marked with the surveyor's identification caps.
   (e)    All survey monumentation shall be identified on the final plat by symbol in the legend and at the location of installation.
   (f)    All survey monumentation shall be in place prior to the release of the Performance Bond. If authorized by the County Engineer, the Developer may obtain a separate bond to install any of such monumentation that cannot be installed prior to the release of the Performance Bond.
   (g)    In accordance with these Subdivision Regulations, a Professional Surveyor registered in the State of Ohio must certify that all required monuments and iron pins are set. This certification also applies to "Planned Residential Developments". The surveying cost to certify proper monument and pin setting will be included in all Performance Bonds.
(Res. 2008-026. Adopted 3-17-08; Ord. 2015-561. Adopted 1-25-16.)