943.14 FEES.
   (a)   At the Concept Plan Meeting, the applicant will pay a fee of two hundred fifty dollars ($250.00) to the County Drainage Engineer.
 
   (b)   The County Drainage Engineer shall establish a fee based upon the actual estimated cost for review, filing, and inspection. At the time of the submittal of the Preliminary Comprehensive Storm Water Management Plan, the applicant will submit a deposit to the County Drainage Engineer to cover the cost of at least fifty percent (50%) of the anticipated fee. The deposit, submitted to the County Drainage Engineer, is required before the review process begins. This deposit will reimburse the MVGT fund for actual expenses as they occur during the review and inspection phases of the project. If and/or when the amount of the deposit is at, or below, ten percent (10%) of the original estimate, a further deposit of funds will be required to restore the balance to fifty percent (50%) of the original anticipated fee. The County Drainage Engineer may halt review until a sufficient deposit is restored.
(Ord. 2013-364. Adopted 8-26-13.)