941.08 COMPLIANCE WITH LOCAL, STATE, AND FEDERAL REGULATIONS.
   All submittals are required to show proof of compliance with all state and federal regulations. Approvals issued in accordance with this Chapter do not relieve the applicant of responsibility for obtaining all other necessary permits and/or approvals from the Ohio EPA, the U.S. Army Corps of Engineers, and other federal, state, and/or county agencies. If requirements vary, the most restrictive requirement shall prevail. These permits may include, but are not limited to, those listed below.   
   (a)   Ohio EPA NPDES Permits authorizing storm water discharges associated with construction activity or the most current version thereof: Proof of compliance with these requirements shall be the applicant’s Notice of Intent (NOI) number from Ohio EPA, a copy of the Ohio EPA Director’s Authorization Letter for the NPDES Permit, or a letter from the site owner certifying and explaining why the NPDES Permit is not applicable.
   (b)   Section 401 of the Clean Water Act: Proof of compliance shall be a copy of the Ohio EPA Water Quality Certification application tracking number, public notice, project approval, or a letter from the site owner certifying that a qualified professional has surveyed the site and determined that Section 401 of the Clean Water Act is not applicable. Wetlands, and other waters of the United States, shall be delineated by protocols accepted by the U.S. Army Corps of Engineers at the time an application is made under this Chapter.
   (c)   Ohio EPA Isolated Wetland Permit: Proof of compliance shall be a copy of Ohio EPA’s Isolated Wetland Permit application tracking number, public notice, project approval, or a letter from the site owner certifying that a qualified professional has surveyed the site and determined that Ohio EPA’s Isolated Wetlands Permit is not applicable. Isolated wetlands shall be delineated by protocols accepted by the U.S. Army Corps of Engineers at the time an application is made under this Chapter.
   (d)   Section 404 of the Clean Water Act: Proof of compliance shall be a copy of the U.S. Army Corps of Engineers Individual Permit application, public notice, or project approval, if an Individual Permit is required for the development project. If an Individual Permit is not required, the site owner shall submit proof of compliance with the U.S. Army Corps of Engineer’s Nationwide Permit Program. This shall include one of the following:
      (1)   A copy of the wetland delineation approved by the U.S. Army Corps of Engineers and/or a copy of the Jurisdictional Determination issued by the U.S. Army Corps of Engineers.
      (2)   A site plan showing that any proposed fill of waters of the United States conforms to the general and special conditions specified in the applicable Nationwide Permit. Wetlands, and other waters of the United States, shall be delineated by protocols accepted by the U.S. Army Corps of Engineers at the time an application is made under this Chapter.
   (e)   Ohio Dam Safety Law: Proof of compliance shall be a copy of the Ohio Department of Natural Resources Division of Water permit application tracking number, a copy of the project approval letter from the Ohio Department of Natural Resources Division of Water, or a letter from the applicant’s engineer certifying and explaining why the Ohio Dam Safety Law is not applicable.
   (f)   Chapter 937 of the Codified Ordinances: Riparian Setbacks: Proof of compliance shall be a copy of the Summit SWCD approval letter, and or zoning certificate from those entities which have adopted the legislation. Riparian setbacks must be shown on the SWP3 and note demarcation and protection during soil disturbing activities.
(Ord. 2006-396. Adopted 3-19-07; Ord. 2016-295. Adopted 8-22-16.)