§ 50.13 POOL FILLING.
   One pool filling per year in accordance with the following:
   (A)   No pool filling permit shall be allowed if an irrigation meter or dock only meter is present;
   (B)   Customer must apply at Town Hall, pay the fee, and sign liability waiver. Water Department personnel will inspect pool within three business days of the date of permit application. Inspection of pool will consist of verifying that pool is empty and verifying pool dimensions and that pool drainage does not enter sanitary sewer;
   (C)   With permit approval, users will be required to pay for the water used to fill the pool and will not be assessed for sewer treatment. The dimensions of the pool (length x width x average depth) submitted on permit will be used to calculate the volume of water for the sewer adjustment; and
   (D)   If no pool filling permit is obtained, sewer treatment charges will not be adjusted and be required to be assessed in accordance with normal billing procedures.
(Prior Code, § 20-12.1) (Ord. passed 3-19-1996; Ord. passed 8-20-2002; Ord. passed 12-21-2010)