The final plat shall meet the following requirements prior to any review of the plat by the Planning Board:
Date Final Plat Submitted:
Date Preliminary Plat Approved:
Name of Subdivision:
Location:
Owner:
Address:
Surveyor: Tel:
Address: Tel:
Checklist:
ADMINISTRATIVE REQUIREMENTS
Notice that improvements guarantee has been accepted or certification of improvements
has been granted.
Submitted within twelve (12) months of preliminary plat approval, unless written extension is granted by the Village Council.
Final plat is eighteen (18”) inches by twenty-four (24”) inches and is at a scale of at least one (1”) inch equals (=) two hundred (200’) feet.
Seven (7) copies submitted, one (1) reproducible and six (6) prints.
REQUIRED DATA
(a) Title Block:
Subdivision name, North Arrow, scale (denoted graphically and numerically), date of plat preparation, location of subdivision (township, county and state), the name(s) of the owner(s) and the registered surveyor responsible for the subdivision (including the seal).
(b) Tract Boundaries:
Exact boundary lines of the tract to be subdivided, fully dimensioned by lengths and bearings, and the location of intersecting boundary lines of adjoining lands.
(c) Adjoining Property Owners:
Names and deed references (when possible) of owners of abutting properties and subdivisions of record (proposed or under review).
(d) Location of Improvements:
All visible and apparent rights-of-way, watercourses, utilities, roadways, and other such improvements shall be accurately located where crossing or forming any boundary of the property shown.
(e) Engineering Data:
Sufficient engineering data to determine readily and reproduce on the ground every straight or curved boundary line, street line, lot line, right-of-way line, and easement line, including dimensions, bearings or deflection angles, radii, central angles, and tangent curved property lines that are not the boundary or curved streets. Building setback lines are to be notated.
(f) Monuments:
The accurate locations and descriptions of all monument markers and control points.
(g) Lot and Block Numbers:
The blocks numbered consecutively throughout the entire subdivision and the lots numbered consecutively throughout each block.
(h) Streets:
Street names and right-of-way lines of all streets. The designation of all streets as public (or private when approved by the Village Council in accordance with the provisions of this Ordinance).
(i) Rights-of-Way:
The location and dimensions of all rights-of-way, utility or other easements, riding trails, natural buffers, pedestrian or bicycle paths, and areas to be dedicated to public use with the purpose of each stated.
REQUIRED CERTIFICATES
The following certificates are to appear on the final plat in such a manner as to ensure that the said certificate will be legible on any prints made therefrom, or are to be submitted with and recorded with the final plat in accordance with the provisions of this Ordinance:
Certificate of Survey and Accuracy signed by the surveyor;
Date
* Certificate of Ownership, Dedication, and Maintenance;
Date
Certificate of Improvements signed by the Subdivision Administrator;
Date
Certificate of approval by the Planning Board;
Date
Certificate of approval by the Village Council;
Date
(Prior Code, Ch. 12 Appendix B)