The Safety-Service Director and the Zoning Commissioner shall review subdivision proposals and other proposed new developments to assure that:
(a) All such proposals are consistent with the need to minimize flood damage;
(b) All public utilities and facilities, such as sewer, gas, electrical, and water systems are located, elevated and constructed to minimize or eliminate flood damage; and
(c) Adequate drainage is provided so as to reduce exposure to flood hazards.
(Ord. 6631. Passed 4-17-74.)