1355.02 BUILDING REQUIREMENTS.
   The Safety-Service Director and the Building Inspector shall review all building permit applications for new construction or substantial improvements to determine whether proposed building sites will be reasonably safe from flooding. If a proposed building site is in a location that has a flood hazard, any proposed construction or substantial improvement (including prefabricated and mobile homes) must:
   (a)    Be designed (or modified) and anchored to prevent flotation, collapse, or lateral movement of the structure;
   (b)    Use construction materials and utility equipment that are resistant to flood damage;
   (c)    Use construction methods and practices that will minimize flood damage.
      (Ord. 6631. Passed 4-17-74. )