7-5-8: RESTORING SURFACES:
Any person or business entity making any excavation or boring in or under any public street, alley or other public place or right- of-way in Stockton Town, shall restore the surface to the construction standards and specifications of the Town existing at the time of the excavation, or, if none, to APWA standards; all backfill shall comply with the requirements of the currently adopted edition of the State of Utah Standard Specifications for Road and Bridge Construction and the standards of the American Public Works Association (APWA). Any opening in a paved or improved portion of the street shall be repaired and the surface replaced, including crack sealing, by the permittee within three (3) working days of excavation, in compliance with the above- referenced standards and under the supervision of the Director. With all excavations, the contractor shall guarantee the materials and workmanship for a period of two (2) years from completion of the work, reasonable wear and tear excepted. All landscaping surfaces affected by excavation work shall also be restored with materials matching those present before the excavation work commenced, to the greatest degree possible. (Ord. 2019-09, 5-9-2019)