1343.08 VACANT BUILDING PLAN- COMMERCIAL OR INDUSTRIAL VACAN BUILDINGS.
   (a)    The owner or person in control of a Vacant Commercial or industrial building shall submit a Vacant Building Plan that shall be approved by the Fire Chief. The Vacant Building Plan shall be selected from and include the minimum requirements from one (1) of the three (3) following categories:
      (1)    Demolition. If the Vacant Commercial or Industrial Building is to be demolished, the Vacant Building Plan shall include a proposed time frame for demolition which shall include a commencement date within thirty (30) days of approval of the proposed demolition time frame and shall not exceed one (1) year in duration.
      (2)    Secured Structure. If the Vacant Commercial or Industrial Building is to remain vacant, the Vacant Building Plan shall be submitted within thirty (30) days of the designation of a Vacant Building and completed within sixty (60) days of said submission or a time as extended by the Fire Chief, and shall contain the following:
         A.    A plan for fire alarm and fire protection as required by the Fire Chief.
         B.    A plan of action to remedy any public nuisance existing in the building or on the property.
         C.    A lighting plan for the exterior of the building and property, walkways adjacent thereto, parking or loading areas and night-time illumination of areas and walkways of the building and property which may be vulnerable to vandalism and vagrancy as determined by the Chief of Police.
         D.    A regular maintenance plan for all exterior lighting and illumination fixtures.
         E.    A plan for the maintenance of all structural openings, such as windows, doors, areaways and other openings to avoid the necessity of boarding up. Windows, doors, areaways, and other openings that are located on the first floor and facing the street shall not be papered, soaped, blacked out, or boarded up, and to avoid the appearance of vacancy, a form of display shall be set up that shall be approved by the Fire Chief or designee.
         F.    A plan of action to maintain the vacant commercial or industrial building and property in compliance with the Vacant Building Maintenance Standards set forth in Section 1343.08 of this Chapter and applicable State Building Codes.
      (3)   Rehabilitation. If the vacant commercial or industrial building is to be returned to lawful occupancy or use, the Vacant Building Plan shall include a rehabilitation time frame for the building and property. The rehabilitation time frame shall not exceed twelve (12) months. The Fire Chief may grant an extension of time upon receipt of a written statement from the owner detailing the reasons for the extension. All applicable laws shall be compiled with and all required permits shall be obtained. The building shall be kept secured and in compliance with the Vacant Building Maintenance Standards as provided in Section 1343.09 of this Chapter at all times during rehabilitation. (Ord. 2019-27. Passed 11-11-19.)