§ 95.63 SHORING OF EXCAVATIONS.
   All openings and excavations shall, where necessary, be properly and substantially sheeted and braced as a safeguard to the workmen and to prevent cave-ins or washouts which would tend to injure and further damage the thoroughfare or subsurface structure of the streets or public ways.
(1990 Code, § 4.33)