1344.03 FINAL SUBDIVISION PLAT.
   (a)   General. The final subdivision plat shall be presented in certified prints at the same scale and contain the same information, except for any changes or additions required by resolution of the Commission, as shown on the preliminary plat. The preliminary plat may be used as the final subdivision plat if it meets these requirements and is revised in accordance with the Planning Commission’s resolution. All revision dates must be shown as well as the following:
      (1)   Notation of any self-imposed restrictions, and location of any building lines proposed to be established in this manner, if required by the Commission in accordance with these Subdivision Regulations.
      (2)   All monuments erected, corners, and other points established in the field in their proper places. The material of which the monuments, corners, or other points are made shall be noted at the representation thereof or by legend, except that lot corners need not be shown. The legend for metal monuments shall indicate the kind of metal, and diameter of monument.
   (b)   Preparation. The final subdivision plat shall be prepared by a licensed professional engineer or land surveyor licensed by the state.
(Ord. 89-11. Passed 8-21-89.)