1343.14 UTILITIES.
   (a)   Location. All utility facilities, including but not limited to gas, electric power, telephone, and CATV cables, shall be located underground throughout the subdivision. Wherever existing utility facilities are located aboveground, except where existing on public roads and rights-of-way, they shall be removed and placed underground. All utility facilities existing and proposed throughout the subdivision shall be shown on the preliminary plat. Underground service connections to the street property line of each platted lot shall be installed at the subdivider’s expense. At the discretion of the Commission, the requirement for service connections to each lot may be waived in the case of adjoining lots to be retained in single ownership and intended to be developed for the same primary use.
   (b)   Easements.
      (1)   Easements centered on front lot lines shall be provided for utilities (private and municipal), such easements shall be at least twelve (12) feet wide.
      (2)   Where topographical or other conditions are such as to make impractical the inclusion of utilities within the front lot lines, perpetual unobstructed easements at least twelve (12) feet in width shall be provided along side lot lines with satisfactory access to the road or rear lot lines. Easements shall be indicated on the plat.
         (Ord. 89-11. Passed 8-21-89.)