(a) Soil Preservation and Final Grading. Developer shall take necessary means to prevent soil erosion as required by the City Building Inspector.
(b) Lot Drainage. Lots shall be laid out so as to provide positive drainage away from all buildings and individual lot drainage shall be coordinated with the general storm drainage pattern for the area. Drainage shall be designed so as to avoid concentration of storm drainage water from each lot to adjacent lots.
(Ord. 89-11. Passed 8-21-89.)