§ 18-173 PERMIT CONDITIONS.
   (A)   A significant industrial user’s discharge permit shall be expressly subject to all provisions of this chapter and all other applicable regulations, user charges and fee established by the city.
   (B)   Permits may contain the following:
      (1)   The unit charge or schedule of user charges and fees for the wastewater to be discharged;
      (2)   Limits on the average and maximum wastewater constituents and characteristics;
      (3)   Limits on average and maximum rate and time of discharge or requirements for flow regulations and equalization;
      (4)   Requirements for installation and maintenance of inspection and sampling facilities;
      (5)   Specifications for monitoring programs which may include sampling locations, frequency of sampling, number, type and standards for tests and reporting schedule;
      (6)   Compliance schedules;
      (7)   Requirements for submission of technical reports or discharge reports;
      (8)   Requirements for maintaining and retaining plant records relating to wastewater discharge as specified by the city, and affording city access thereto;
      (9)   Requirements for notification to the city of any new introduction of wastewater constituents or any substantial change in the volume or character of the wastewater constituents being introduced into the wastewater treatment system;
      (10)   Requirements for notification of slug discharges as per § 18-161 of this chapter; and
      (11)   Other conditions as deemed appropriate by the city to ensure compliance with this chapter.
(2011 Code, § 18-173)