All communications towers located in the city shall be subject to the following regulations.
(A) Engineer’s certification. Applications for a communications tower permit shall include detailed plans and specifications certified by an engineer. Upon completion of construction, the engineer shall further certify that the tower has been constructed in conformity with the plans and specifications.
(B) Minimum setback. The minimum distance from the base of the tower to the closest property line of the tower site shall not be less than 60% of the tower height.
(C) Enclosure. The tower base shall be completely enclosed by a fence or wall six feet in height designed, constructed and maintained to prevent unauthorized access to the tower.
(D) EMF emissions. All towers shall be maintained and operated in compliance with the standards adopted by the federal communications commission concerning electromagnetic field emissions.
(E) Maximum height. No tower shall exceed a height of 200 feet.
(Prior Code, § 8-8-6) (Ord. 487, passed 1-5-1998) Penalty, see § 10.99