Loading...
The industrial user’s cost for treatment of its wastes shall be based upon all factors which significantly affect the cost of the treatment works, including strength, volume and flow characteristics of the sewerage as defined and set forth § 52.002 of this chapter.
(1994 Code, § 52.082) (Ord. 263, passed 3-8-1976)
During the industrial cost recovery period defined herein, each industrial user of the sewerage treatment works shall pay is share of the total grant moneys expended divided by the recovery period years. The payments shall be made on an annual basis by each industrial user. The first payment by an industrial user shall be made no later than one year after the user begins use of the sewage treatment works.
(1994 Code, § 52.083) (Ord. 263, passed 3-8-1976)
If there is a substantial change in the strength, volume or delivery flow rate characteristics introduced into the sewerage treatment works by an industrial user, the user’s share as set forth herein shall be adjusted accordingly.
(1994 Code, § 52.084) (Ord. 263, passed 3-8-1976)
An industrial user’s share as set forth herein shall not include any portion of the grant amount allocable to unused or unreserved sewerage treatment works capacity and an industrial user’s share shall not include any interest component as a part of the charge.
(1994 Code, § 52.085) (Ord. 263, passed 3-8-1976)
The city shall retain 50% of the amounts recovered from industrial users. The remainder, together with any interest earned thereon, shall be returned to the United States Treasury through the federal environmental protection agency on an annual basis.
(1994 Code, § 52.086) (Ord. 263, passed 3-8-1976)
Loading...