(A) Each user at the time he or she is connected with the waterworks system, shall pay a charge to cover the costs of: tapping the main; furnishing and laying service pipe from main to property line, corporation and stock cocks, meter box, and yoke; and furnishing any meter and installing the meter.
(B) The charge for five-eighths-inch or three-fourths-inch meter tap shall be $495. The charge for a tap larger than the five-eighths-inch or three-fourths-inch meter tap shall be the cost of labor, materials, equipment, and overhead.
(Prior Code, § 51.07) (Ord. 04-03-01, passed 4-13-2004; Ord. 03-10-2014-01, passed - -2014)