1010.03 RIGHT- OF-WAY PERMIT.
   (a)    The Building Inspector shall review the application for any work in the right of way for compliance with Section 1010.02 and determine if a permit may be issued. If a permit is granted, a fee in the amount of fifty dollars ($50.00) shall be submitted to the Village by the applicant. The Building Inspector will also determine if a bond is required, and, if so, the bond must be submitted prior to issuance of the permit. The bond may be either cash, certified check, or a surety bond satisfactory to the Building Inspector. The bond shall not exceed the maximum cost necessary to reimburse the Village should it be necessary for the Village to complete that portion of the work involving its streets, rights of way, drainage system, water and sewer systems and sidewalks.
   (b)    The work shall be performed under the direction of the Building Inspector and the Street Commissioner and in accordance with the specifications approved by the Building Inspector. If the work does not proceed according to the Inspector and the Commissioner, the Inspector may withdraw the permit and turn the matter over to the Village Engineer to proceed in accordance with Sections 1010.04 through 1010.05. (Ord.1993-2. Passed 1-11-93.)