§ 150.47 ADDITIONAL FEES.
   In addition to the base building permit fee above set forth, the building permit fee shall include the aggregate of the following:
   (A)   Sanitary sewer and water system connection fee for residential units. A fee for connecting to the village sanitary sewer and water systems for a residential unit shall be in conformance with § 51.05 Rates and charges for waterworks and sewerage service.
   (B)   Sanitary sewer and water connection fee for nonresidential units. A fee for connecting to the village sanitary sewer and water system shall be in conformance with § 51.05 Rates and charges for waterworks and sewerage service.
   (C)   Reinspection fee. A reinspection fee of $75 per inspection shall be charged in every instance where the contractor/developer requesting the inspection fails to meet the requirements of this code or the plans and specifications or fails to keep an appointment with a building inspector.
   (D)   Elevator inspection fee. An annual inspection fee of $100 per elevator per inspection shall be charged to the owner of each building in which an elevator is located within the jurisdiction of the village, with the exception of those located in schools.
   (E)   Plan review fee. A preliminary and/or plan review fee by the village staff shall be charged at 25% of permit fees.
   (F)   Consultants fees. The applicant shall reimburse the village for all fees and expenses charged the village by consultants retained by the village to review plans, building systems and to perform testing where deemed necessary by the village.
(Ord. 1998-19, passed 4-20-98; Am. Ord. 1999-31, passed 5-17-99; Am. Ord. 2000-23, passed 5-15-00; Am. Ord. 2005-25, passed 5-2-05; Am. Ord. 2008-13, passed 3-17-08; Am. Ord. 2009-14, passed 4-20-09; Am. Ord. 2010-23, passed 4-19-10; Am. Ord. 2020-37, passed 8-17-20)