§ 1424.09 REVIEW OF BUILDING PERMITS AND SUBDIVISION PROPOSALS FOR FLOOD HAZARDS.
   (a)   The Chief Building Official and City Engineer shall review all building permit applications for new construction or substantial improvements to determine whether proposed building sites will be reasonably safe from flooding. If a proposed building site is in a location that has a flood hazard, any proposed new construction or substantial improvement, including prefabricated and mobile homes, must:
      (1)   Be designed or modified and anchored to prevent flotation, collapse or lateral movement of the structure;
      (2)   Use construction materials and utility equipment that is resistant to flood damage; and
      (3)   Use construction methods and practices that will minimize flood damage.
   (b)   The City Engineer shall review subdivision proposals and other proposed new developments to assure that:
      (1)   All such proposals are consistent with the need to minimize flood damage;
      (2)   All public utilities and facilities, such as sewer, gas, electrical and water systems, are located, elevated and constructed to minimize or eliminate flood damage; and
      (3)   Adequate drainage is provided so as to reduce exposure to flood hazards.
   (c)   The City Engineer shall require new or replacement water supply systems and/or sanitary sewage systems to be designed to minimize or eliminate infiltration of flood waters into the systems and discharges from the systems into flood waters, and shall require on-site waste disposal systems to be located so as to avoid impairment of them or contamination from them during flooding.
(Res. 1975-60, passed 5-19-1975)