The specific plan establishes minimum required setbacks for each development area based on existing setbacks on the developed portion of the site and proposed setbacks on the undeveloped portions of the site, and requires overall conformity with the full build-out conceptual site plan. (Ord. 2021-05-1519 § 5 (part))