Loading...
20.04.102   Building height.
   "Building height" means the vertical distance measured from the highest point of the structure to the datum line immediately opposite the highest point. The datum line shall begin at the midpoint of the front lot line at natural grade and shall follow the natural contour of the lot to the midpoint of the rear lot line. (See Std. Drawing No. 807.) In determining the natural ground elevation, the director of planning and community development shall determine the same from the topographic maps prepared by photogrametric methods on June 24, 1960, on file in the city hall.
(Ord. 80-6-847 § 3: Ord. 70-1-636 § 2: prior code § 19.08.240 (Ord. 557 § 105(B) (part), 1964))
20.04.105   Building, main.
   "Main building" means a building within which is conducted the principal use permitted on the lot, as provided by this title.
(Prior code § 19.08.245 (Ord. 557 § 105(B) (part), 1964))
20.04.108   Building setback line.
   "Building setback line" means the minimum distance, as prescribed by this title, between any property line and the closest point of the foundation of any building or structure related thereto.
(Prior code § 19.08.250 (Ord. 557 § 105(B) (part), 1964))
20.04.111   Building site.
   "Building site" means the ground area of a building, together with all the open space required by this title.
(Prior code § 19.08.255 (Ord. 557 § 105(B) (part), 1964))
20.04.114   Building, temporary.
   "Temporary building" means the same as "temporary structure."
(Prior code § 19.08.260 (Ord. 557 § 105(B) (part), 1964))
Loading...