A. Every bond posted pursuant to this chapter shall be conditioned as follows:
1. That each and all of the terms and conditions of the housemoving permit shall be complied with to the satisfaction of the building inspector;
2. That all of the work required to be done pursuant to the terms and conditions of the housemoving permit shall be fully performed and completed within ninety days after the date of the issuance by the building inspector of the housemoving permit. The time limit specified in this section or the time limit specified in any permit, may be extended for good and sufficient cause by the building inspector.
B. No such extension of time shall be valid unless written and no such extension shall release any surety upon any bond.
(Prior code § 14.24.060(B) (Ord. 387 § 6(b), 1954))