907.21   PAVEMENT CUTS.
   (a)   All pavement cuts made by any person or entity shall be repaired in accordance with the pavement cut standards established by the Public Works Director and on file in his/her office. All repairs shall be satisfactorily completed within 21 days of the pavement cut.
   (b)   Any person or entity making a pavement cut or multiple cuts within a close proximity within the right of way within five (5) years of the completion of a contract for the resurfacing or microsurfacing of such pavement shall provide for the resurfacing of the entire width of the travel lane within which the pavement cut was made. The resurfacing of the lane shall be accomplished no later than October 15 of the year of the completion of said work within the right of way. The resurfacing shall consist of the planing (1.5") and paving (1.5") of the surface course of asphalt for a minimum length of 15 feet measured in the direction of travel. The person or entity making the pavement cut shall be responsible for the resurfaced lane for a period of two (2) years from the date of the final inspection. A sufficient bond in an amount determined by the Public Works Director shall be kept during this period.
(Ord. A-2963. Passed 4-22-19; Ord. A-2997. Passed 2-24-20.)