(A) Any person who desires to make any excavation or opening for any purpose in any street, alley or other right-of-way, or underneath the surface of any street, alley or right-of-way in the city, shall first make application on a right-of-way cut permit application for a permit setting out the location, purpose, length and width of the proposed excavation to the City Engineer's office.
(B) The application shall be accompanied by a fee as set out in the Right-of-Way Fee and Fine Schedule as follows:
Residential driveway | $50 |
Commercial and industrial driveway | $250 |
Residential sidewalk only | $25 |
Commercial and industrial sidewalk only | $50 |
Street cuts under 100 sq. ft. | $150 |
Street cuts 100-500 sq. ft. | $300 |
Street cuts over 500 sq. ft. | $500 + $2.00/sq. ft. over 500 sq. ft. |
Boring (directional, jack and bore, trenching, etc.) under 300 linear ft. | $250 |
Boring 300 to 600 linear ft. | $350 |
Boring over 600 linear ft. | $500 |
Service lines/tap replacements that are a part of a larger main installation project | $50 per parcel |
Miscellaneous right-of-way work*** | $50 minimum fee per cut |
***To be set by City Engineer and/or Board of Public Works and Safety, depending on the scope of work. | |
(`81 Code, § 95.36) (Am. Ord. 12-2684, passed 4-16-12; Am. Ord. 13-2728, passed 11-8-13; Am. Ord. 16-2787, passed 4-4-16) Penalty, see § 10.99