1369.01 REQUIREMENTS.
   (a)   Sewage treatment plants shall be designed to provide adequate treatment for the area to be serviced. The maximum capacity shall be 250 G.P.D. per capita and the minimum shall be 130 G.P.D. per capita.
   (b)   The location and elevation shall be approved by the Village and shall be such as to provide for disposal of effluent.
   (c)   The site shall be of a large area for future expansion and the plant shall be of the expandable type.
   (d)   The site shall include access paved roads, a parking area, fencing, lighting, seeding and protective shrubbing.
   (e)   Toilet and office facilities shall be provided in the plant.
   (f)   An aerobic digestion-type plant is preferred. The digestion unit is to be designed for the capacity of the plant. Final settling tanks shall be designed for four hours of detention. The tanks shall include all electrical and mechanical equipment, including a chlorinator, a comminutor, a wet well and a lift station if necessary for grade.
(Ord. 352. Passed 10-22-62.)