Any concrete work not formed as shown on the drawings, or for any reason out of alignment or level or which shows a defective surface, or is not installed in conformance with these specifications, shall be considered as not conforming with the intent of these specifications and shall be removed from the job by the contractor at his or her expense, unless the Village grants permission to patch the defective area. Permission to patch any such area shall not be considered a waiver of the Village’s right to require complete removal of the defective work if the patching does not, in its opinion, satisfactorily restore the quality of the concrete and the appearance of the concrete. Concrete so ordered removed, but not removed within a reasonable period stated in writing to the contractor, shall be removed by the Village and the expense incurred shall be charged to the contractor.
(Ord. 352. Passed 10-22-62.)