1363.07 REQUIREMENTS FOR SMOOTHNESS.
   The tops of all curbs and the gutters of all combined curbs and gutters shall be tested during construction, and after removal of the forms, with a ten-foot straight edge, and all variations which exceed one-eighth inch in a ten-foot length shall be satisfactorily corrected. The back of all curbs and the back of the curb and the face of the gutter for combined curbs and gutters shall be checked for line by a fifty-foot stringline, and all variations from line which exceed one- quarter of an inch in a fifty-foot length shall be satisfactorily corrected.
(Ord. 352. Passed 10-22-62.)