The amount of money to be paid for building permits shall be determined by the Building Inspector under the terms of this chapter and shall be noted on the application when approved for the issuance of the permit. The fees shall be paid to the Building Inspector who shall give a receipt therefor and the permit shall be issued to the applicant. The moneys so collected shall be paid to the Clerk-Treasurer daily, and the Clerk-Treasurer shall issue to the Building Inspector the Village receipt for the same, and such moneys shall be credited to the Building Department Fund. The fees to be paid shall be as follows:
(a) Residential. | |
(1) New structures. | |
A. House/attached garage | $150.00 plus 10.00 per 100 square foot
or fractional part thereof |
B. Electric | 125.00
plus 1.50 per 100 square foot |
C. Plumbing | 100.00
plus 1.50 per 100 square foot |
D. Heating |
75.00 |
E. Air conditioning |
50.00 |
F. Occupancy |
25.00 |
(2) Alterations and/or additions. | |
A. Building | 50.00 plus 10.00 per 100 square foot
or fractional part thereof |
B. Electric | 75.00 plus 1.50 per 100 square foot or
fractional part thereof |
C. Plumbing | 75.00 plus 1.50 per 100 square foot or
fractional part thereof |
D. Heating (additional) |
50.00 |
E. Air conditioning (additional) |
50.00 |
F. Mechanical system alt. (extension of ducting)
(Ord. 1787. Passed 11-26-01.) |
50.00 |
(3) Miscellaneous. | |
A. Re-inspection each time (to be paid before occupancy) |
35.00 |
B. Outbuildings (garages, pole buildings) | 100.00 for the first 400 square feet plus 5.00 per 100 square feet over 400 square feet
or fractional part thereof |
C. Decks and sheds |
25.00 |
D. Fences |
25.00 |
E. Swimming pools | |
1. Above ground (includes electrical) |
$75.00 |
2. In ground (includes electrical) |
150.00 |
F. Siding/roofing/windows (each with discretion) gutters/aluminum/vinyl trim |
25.00 |
G. Electrical service upgrade |
75.00 |
H. Drives |
25.00 |
I. Demolition | |
1. Applied for |
50.00 |
2. Citation |
100.00 |
J. Foundation/waterproof/tile | |
1. Wall one or more, fee per wall |
35.00 |
2. Connection at foundation |
50.00 |
K. Inspection of property grade and drainage |
150.00 |
L. Review of plot plan
(Ord. 1986. Passed 10-25-04.) | (toward hourly fees billed to Village) |
(b) Commercial/Industrial | |
(1) New, alterations and/or additions | |
A. Application fee (to be applied if permit issued) |
50.00 |
B. Plans | |
1. New addition/alteration | 250.00 plus 5.00 per 100 square feet or fractional part thereof |
2. Sprinkler | 150.00 plus 2.00 per 100 square feet or fractional part thereof |
3. Hood |
100.00 |
4. Hood suppression |
100.00 |
C. Building | |
1. New | 300.00 plus 10.00 per 100 square feet or fractional part thereof |
2. Alteration | 100.00 plus 10.00 per 100 square feet or fractional part thereof |
3. Addition | 150.00 plus 10.00 per 100 square feet or fractional part thereof |
D. Electrical (new/alteration/addition) |
$150.00 plus 5.75 per 100 square feet or fractional part thereof |
1. Temporary service |
25.00 |
2. Fire alarm | 250.00
plus 5.00 per device |
3. Security alarm | 250.00 plus 5.00 per device |
E. Plumbing (new/alteration/addition) | 150.00 plus 4.50 per 100 square feet or fractional part thereof |
F. Heating (new/alteration/addition) |
per unit 100.00 |
G. Air conditioning (new/alteration/addition) |
per unit 100.00 |
H. Mechanical system alteration |
75.00 |
1. New | 150.00 plus 5.75 per 100 square feet or fractional part thereof |
2. Alteration/addition | 100.00 plus 1.50 per 100 square feet or fractional part thereof |
I. Sprinkler system | |
1. New | 200.00 plus 5.00 per 100 square feet or fractional part thereof |
2. Alteration/addition | 100.00 plus 1.50 per 100 square feet or fractional part thereof |
(2) Miscellaneous. | |
A. Re-plans examination |
150.00 |
B. Reinspection | 75.00 each time (to be paid before occupancy) |
C. Greenhouses/farm buildings |
50.00 |
D. Site plans (grading/parking/ drainage/drives/drive pipes) |
200.00 |
E. Furnace/air conditioning/ water tank replacement
per unit |
75.00 |
F. Re-roof |
50.00 |
G. Fence |
35.00 |
H. Demolition |
50.00 |
1. Applied for |
50.00 |
2. Citation |
100.00 |
I. Electric service charge |
75.00 |
J. Fireplace | |
1. Masonry construction |
50.00 |
2. Manufactured type |
35.00 |
K. Commercial Exhaust Hoods/Fans | 75.00 per hood plus plan review |
L. Replace hood/fan/duct |
each 75.00 |
M. Walk-in Refrigeration Coolers |
each 75.00 |
N. Commercial Hood Suppression | 150.00 plus plan review |
(Ord. 2502. Passed 7-27-15.)
(c) Other.
(1) There shall be a twenty-five dollar ($25.00) fee paid to the Village for inspections made with less than twenty-four hours notice.
(2) There shall be a one-hundred-twenty-five dollar ($125.00) registration fee for general contractors and a fifty dollar ($50.00) registration fee for subcontractors.
(3) There shall be a ten dollar ($10.00) fee paid to the Village for a Zoning Permit.
(4) There shall be a three hundred and fifty dollar ($350.00) fee paid to the Village for a Rezoning Permit. (Ord. 1787. Passed 11-26-01.)
(d) Board of Zoning Appeals Hearing Fee. The Board of Zoning Appeals is hereby authorized to require a one hundred dollar ($100.00) non-refundable application fee for all scheduled hearings requested by applicants for a hearing before said Board.
(Ord. 1728. Passed 7-26-99.)