§ 155.43  STANDARDS FOR FLOODPLAINS WITHOUT ESTABLISHED BASE FLOOD ELEVATIONS.
   Within the Special Flood Hazard Areas established in § 155.07, where no Base Flood Elevation (BFE) data has been provided, the following provisions shall apply.
   (A)   No encroachments, including fill, new construction, substantial improvements or new development shall be permitted within a distance of 20 feet each side from top of bank or five times the width of the stream whichever is greater, unless certification with supporting technical data by a registered professional engineer is provided demonstrating that such encroachments shall not result in any increase in flood levels during the occurrence of the base flood discharge.
   (B)   The regulatory flood protection elevation shall be determined based on one of the following criteria set in priority order.
      (1)   If Base Flood Elevation (BFE) data is available from other sources, all new construction and substantial improvements within such areas shall also comply with all applicable provisions of this chapter and shall be elevated or floodproofed in accordance with elevations established in accordance with § 155.27(K) and (L).
      (2)   All subdivision, manufactured home park and other development proposals located within Special Flood Hazard Areas shall provide Base Flood Elevation (BFE) data if development is greater than five acres or has more than 50 lots/manufactured home sites. Such Base Flood Elevation (BFE) data shall be adopted by reference per § 155.07 to be utilized in implementing this chapter.
      (3)   When Base Flood Elevation (BFE) data is not available from a federal, state, or other source as outlined above, the reference level, including basement, shall be elevated at least two feet above the highest adjacent grade (natural grade if known).
(Ord. passed 10-5-2004)