(a) The subdivider, their engineer or contractor, shall give notice to the City Engineer at least twenty-four (24) hours in advance of any construction of physical public improvements, including grading of such public improvements, in order that an inspector may be assigned. The contractor shall be billed for all inspections at the currently prevailing rate for inspectors.
(b) All necessary testing of materials will be done by a testing laboratory at no cost to the City. The subdivider, their engineer or contractor shall be billed directly by the testing laboratory for any testing of materials incorporated in the paving.
(Ord. 2022-22. Passed 5-10-22.)