1333.02 PERMIT AND CLEAN-UP.
   (a)   Any paint remover described in Section 1333.01(b) shall tarp and thoroughly clean up any debris, as specified in Section 1333.05.
   (b)   No person shall abrasively clean, remove, or strip paint from the exterior surface of any structure by:
      (1)   Abrasive cleaning or stripping; or
      (2)   Any other process, including heat guns, scraping or power sanding where paint is being removed from more than twenty-five percent (25%) of any exterior wall surface of a structure
without first obtaining a permit from the Commissioner of Building. A separate permit is required for each separate job or location.
   (c)   A contractor acting under a contract with the City need not obtain a permit, but shall comply with all requirements of a permit holder.
(Ord. 91-165. Enacted 3-30-92; Ord. 13-114. Enacted 12-16-13.)