1307.03 AT SITE.
   (a)   The Commissioner of Building shall inspect all buildings at the following periods of construction:
      (1)   Installation of footing drains, building drains and building sewers.
      (2)   Completion of foundation and waterproofing.
      (3)   During the framing of the superstructure.
      (4)   Completion of roughing-in the plumbing, electrical wiring, gas piping, heating ducts or piping, or other similar service installations regulated by this Building Code.
      (5)   Before closing in all structural elements.
      (6)   Upon the final completion of the structure.
   (b)   He may also inspect such building at any time as he may determine to be necessary or desirable. (Ord. 17-92. Enacted 11-13-17.)