9-2-2: PERMIT REQUIREMENTS:
   A.   Permit Required: It shall be unlawful for any person to construct, install, enlarge or alter any swimming pool unless a building permit has first been obtained from the Building Inspector.
   B.   Application For Permit: Application shall be on forms provided by the Building Inspector, and shall be accompanied by plans drawn to scale showing the following:
      1.   Pool dimensions and volume of water in gallons (liters).
      2.   Location and type as per the sewer regulations in Title 8, Chapter 2 of this Code.
      3.   Location of pool on lot, distance from lot lines, and distance from structure.
      4.   Fencing and landscape plan, or a combination thereof. (Ord. 90-09, 5-15-1990; amd. 1994 Code)
   C.   Fees: The permit fee shall be as set forth in subsection 10-6-4B of this Code. (Ord. 98-16, 7-21-1998)