§ 54.41 APPLICATION.
   (A)   Users required to obtain a wastewater discharge permit shall complete and file with the city an application in the form prescribed by the city. Existing users shall apply for a wastewater discharge permit within 30 days after the effective date of this chapter and proposed new users shall apply at least 90 days prior to connecting to or contributing to the POTW. In support of the application, the user shall submit, in units and terms appropriate for evaluation, the following information:
      (1)   Name, address, and location, if different from the address;
      (2)   SIC number according to the Standard Industrial Classification Manual, Office of Management and Budget, 1972, as amended;
      (3)   Wastewater constituents and characteristics, including but not limited to those mentioned in §§ 54.60 through 54.68, as determined by a reliable analytical laboratory; sampling and analysis shall be performed in accordance with procedures established by the EPA pursuant to § 304(g) of the Act and contained in 40 C.F.R. pt. 136, as amended;
      (4)   Time and duration of contribution;
      (5)   Average daily and 30-minute peak wastewater flow rates, including daily, monthly, and seasonal variations if any;
      (6)   Site plans, floor plans, mechanical and plumbing plans, and details to show all sewers, sewer connections, and appurtenances by the size, location, and elevation;
      (7)   Description of activities, facilities, and plant processes on the premises, including all materials which are or could be discharged;
      (8)   Where known, the nature and concentration of any pollutant in the discharge which are limited by any city, state, or federal pretreatment standards; and a statement regarding whether or not the pretreatment standards are being met on a consistent basis and, if not, whether additional operation and maintenance (O and M) or additional pretreatment is required for the user to meet applicable pretreatment standards;
      (9)   If additional pretreatment and/or operation and maintenance (O and M) will be required to meet the pretreatment standards, the shortest schedule by which the user will provide the additional pretreatment. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. The following conditions shall apply to this schedule:
         (a)   The schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards (e.g., hiring an engineer, completing preliminary plans, completing final plans, executing contract for major components, commencing construction, completing construction, and the like);
         (b)   No increment referred to in division (A)(9)(a) of this section shall exceed nine months; and
         (c)   Not later than 14 days following each date in the schedule and the final date for compliance, the user shall submit a progress report to the Superintendent including, as a minimum, whether or not it complied with the increment of progress to be met on that date and, if not, the date on which it expects to comply with this increment of progress, the reason for delay, and the steps being taken by the user to return the construction to the schedule established. In no event shall more than nine months elapse between the progress reports to the Superintendent.
      (10)   Each product produced by type, amount, process or processes, and rate of production;
      (11)   Type and amount of raw materials processes (average and maximum per day);
      (12)   Number and type of employees, and hours of operation of plant and proposed or actual hours of operation of pretreatment system; and
      (13)   Any other information as may be deemed by the city to be necessary to evaluate the permit application.
   (B)   The city will evaluate the data furnished by the user and may require additional information. After evaluation and acceptance of the data furnished, the city may issue a wastewater discharge permit subject to terms and conditions provided in this subchapter.
(Ord. 02-03, passed 7-15-2002)