(A) When city employees perform work which for any lawful reason can be charged to some other person, the rate charged to the other person shall be as set forth in this section, plus an additional 15% administrative fee.
(B) For work involving the use of city equipment, the following rates shall be charged.
Asphalt kettles | $50/hour |
Bucket truck | $60/hour |
Cement saw | $6 linear foot |
Chain saw | $30/hour |
Chipper | $45/hour |
Compressors | $25/hour |
Dump truck | $65/hour |
Fire hydrants | $10/per day, plus charges for water consumed as specified elsewhere |
Flusher truck | $65/hour |
Forklift | $40/hour |
Hand blowers (snow) | $25/hour |
Hand mower | $25/hour |
Line eraser | $35/hour |
Loaders | $85/hour |
Motor graders | $85/hour |
One-ton trucks | $30/hour |
Paint guns | $30/hour |
Paint machines (ride-on) | $65/hour |
Pickups and other vehicles | $30/hour |
Pump 4" | $30/hour |
Pump (Homelite 3") | $25/hour |
Salt spreaders | $85/hour |
Sampler | $20/per day |
Sewer jet | $250/hour |
Emergency | $350/hour |
Skid-steer loader | $45/hour |
Snow blowers (on-loaders) | $60/hour |
Snow plows: Jeep and the like | $40/hour |
Stanley power unit | $20/hour |
Sweepers | $85/hour |
Tapping machine A-2 | $30/hour |
Tapping machine B-100 | $30/hour |
Tapping machine D-5 | $30/hour |
Tractor with backhoe | $85/hour |
Tractor with mowers | $60/hour |
Wastewater televised pipeline inspection | $225/hour |
After regular business hours | $325/hour |
Weed eater | $10/hour |
Wet tapping equipment | $200/hour |
(C) For the repair of frozen water meters, the rate charged shall be the labor rate for city employees specified elsewhere in this section. In addition thereto, the city shall charge for transportation at the rate of $15 per hour with a $5 minimum and the following frozen meter fee.
5/8-inch meter | $10.25 |
3/4-inch meter | $16.18 |
1-inch meter | $22.95 |
(D) (1) For the labor of city employees, the rate charged shall be per employee per hour or fraction based on the following schedule.
Street Department employee | $55 |
Water Department employee | $44 |
Wastewater Department employee | $41 |
(2) If overtime is involved, the rate charted shall be one and one-half times the rate listed above per hour or fraction thereof.
(Ord. 3824, passed - -2004; Ord. 4227, passed 4-2-2018)