In addition to any modifications of the tentative plan approved as provided in § 25-15-16 of this article, the final plan shall include:
(A) A site plan showing the areas to be developed for buildings, the areas to be developed for parking, the location of pedestrian paths and vehicular roads, the location of ingress and egress (including access streets where required), the location and height of walls, provisions for loading and unloading, the location, size, and number of signs, and the location and types of improvements to be made in relating to the use of abutting lots or tracts of land and other zones;
(B) Architect’s sketches of the proposed buildings and landscaping;
(C) Preliminary engineering plans of the improvements to be installed;
(D) A schedule for planned construction showing the anticipated completion date;
(E) A statement of the types of businesses and uses proposed to be served; and
(F) A statement of the ownership of the proposed planned business center.
(Ord. 3639, passed - -2000)