§ 25-14-4 VARIANCE; EXPIRATION.
   If a variance is granted for use requiring construction, modification, or alteration of a building or structure for which a building permit is required, the right to such variance shall expire unless the required building permit is issued within six months after the variance is granted.
(Ord. 3639, passed - -2000)