§ 24-3-21 CHANGES TO PLANS.
   All changes or modifications to the approved SWPPP must adhere to the following conditions.
   (A)   All proposals to modify the approved plans must clearly documented in the SWPPP and available to the stormwater inspector during any inspection.
   (B)   The permittee shall submit requests for major revisions to approved SWPPP, such as the addition or deletion of a sediment basin, to the Stormwater Pollution Prevention Plan Inspector, or his or her designee. This includes revisions due to plan and site discrepancies, and inadequacies at controlling erosion and sediment as revealed through inspection.