§ 24-3-6 SWPPP PERFORMANCE STANDARDS.
   A construction project shall be considered in conformance with this article if soils have been prevented from being deposited onto adjacent properties, rights-of-ways, public storm system, or wetland or watercourse. The design, testing, installation, and maintenance of erosion and sediment control operations and facilities shall adhere to city-approved design standards, as well as standards specifications in the most current authorization to discharge under the national pollutant discharge elimination system general NPDES permit for stormwater discharges from construction sites to waters of the state, which shall be hereby incorporated into this article. In the event of conflict, a copy of the NOI, SWPPP, and the CSW shall be filed with the Development Services Department of the city and Stormwater Pollution Prevention Plan Inspector for the city.