No person shall, within the city, construct, repair, modify or destroy any cathodic protection well which is over 50 feet deep, any engineering test hole which is over 50 feet deep, any monitoring well, or any water well unless such work is done pursuant to and in compliance with an unexpired written permit for such work issued by the department as provided in this subchapter. Additionally, for any cathodic protection well or engineering test hole, if groundwater is encountered (or expected to be encountered) shallower than 50 feet deep, a permit is required. A copy of the approved permit shall be made available for inspection on the job site during any work authorized by the permit.
(‘81 Code, § 8.40.030) (Ord. 945, passed - -91; Am. Ord. 1274, passed 6-5-17) Penalty, see § 52.999