Loading...
A mobile home shall be permitted to be used as a single-family dwelling unit on a lot in the A-1, R-A, and R-1, R-2, R-3 and R-4 Zones subject to the following provisions:
(A) The mobile home shall be certified under the National Manufactured Housing Construction and Safety Act of 1974 (42 USC 5401 et seq.).
(B) The mobile home shall be placed on a foundation system, pursuant to Cal. Health & Safety Code § 18551.
(C) The mobile home shall meet all of the provisions of the zone in which it is placed, including, but not limited to, building setback standards, front, side and rear yard requirements, parking requirements, accessory building regulations, access, and the architectural provisions of § 156.028; provided, however, that only one such mobile home shall be placed on any one lot.
(D) A building permit for the placement of the mobile home on the foundation and the construction of any and all accessory buildings shall be obtained from the city.
('81 Code, § 17.06.073) (Ord. 755, passed - -81)
Cross-reference:
Mobile homes and mobile home parks, see Ch. 152
(A) All single-family dwelling units, including mobile homes placed on a permanent foundation in accordance with § 156.027, constructed, erected or moved onto a permanent foundation on property in any A-1, R-A or R-1 Zone, shall conform to the following standards:
(1) No sheet metal roofs shall be permitted; provided, however, that metal roofs which simulate wood shake and shingle roofs shall be permitted, as shall metal patio roofs.
(2) All main buildings or structures shall have eave overhangs of a minimum of 16 inches or a minimum one-foot-high parapet extending above roof level.
(3) No metal siding shall be permitted with the exception of metal lap siding.
(B) Variances from the provisions of this section may be requested under the provisions of Ch. 16.220.
('81 Code, § 17.06.076) (Ord. 755, passed - -81) Penalty, see § 156.999
Cross-reference:
Mobile homes and mobile home parks, see Ch. 152
Any building or structure for which a building permit has been issued prior to the effective date of the ordinance codified in this chapter may be completed and used in accordance with the plans, specifications and permits on which such building permit was granted if construction is commenced within 60 days after the issuance of such permit and diligently prosecuted to completion.
('81 Code, § 17.06.090) (Ord. 704, passed - -78)
(A) Except where otherwise provided for in this chapter, every dwelling shall face or have frontage upon a street or permanent means of access to a street by way of a public or private easement or passageway other than an alley.
(B) Such easements shall be not less than 20 feet in width.
('81 Code, § 17.06.120) (Ord. 704, passed - -78) Penalty, see § 156.999
Except where otherwise provided for in this chapter, all uses in commercial and manufacturing zones shall be conducted entirely within enclosed buildings.
('81 Code, § 17.06.130) (Ord. 704, passed - -78) Penalty, see § 156.999
Loading...