(A) The contractor doing work pursuant to this subchapter shall, immediately after backfilling the excavation, replace with temporary or permanent patch material or repair any portion of the highway surface removed or damaged by the excavation, obstruction or construction operations to the satisfaction of the Director of Public Works.
(B) Violation of this section shall be deemed an infraction.
('64 Code, § 19-55) (Ord. 164, passed 12-20-60) Penalty, see § 10.97