§ 114.053 PEDESTRIAN WALKS; TRACK CHANGES.
   If pedestrian walks are in place, the grantee shall reconstruct such walks. If pedestrian walks are constructed after the spur track has been laid, the grantee shall construct that portion of the walk between the rails and two feet on each side thereof. In either case, the grantee shall maintain such portions of such pedestrian walks to standards of adjacent walks or to standards approved by the Director of Public Works. The top of the rails shall be maintained at all times at the established grade of the city street at the crossing. All construction, repairs or any other changes of track shall be made under the inspection and to the satisfaction of the Director of Public Works, in compliance with the provisions of the ordinances and regulations of the city, as now existing or hereafter amended.
('64 Code, § 10-47) (Ord. 168, passed 2-9-61) Penalty, see § 10.97